A typical cubic metre of concrete needs roughly 300 to 400 kg of cement, depending on the mix. See the calculation, a ratio table and bag conversions.

On this page
  1. Short answer
  2. The calculation
  3. Cement per cubic metre by ratio
  4. Converting to bags
  5. Cubic yard version
  6. Why real figures differ

Short answer

A cubic metre of typical general-purpose concrete needs roughly 300 to 400 kg of cement. That is about 6 to 8 bags of 50 kg, or 12 to 16 bags of 25 kg. The exact amount depends on the mix ratio and the materials used. Designed, ready-mixed concrete may use more or less cement, depending on the grade and admixtures.

The calculation

For a nominal mix specified by volume (cement : sand : aggregate), you can estimate cement as follows:

  1. Dry volume: wet concrete shrinks as the ingredients pack together, so about 1.54 m³ of dry materials is needed to make 1 m³ of concrete. (Some sources use values between about 1.5 and 1.57.)
  2. Cement share: divide the cement part by the sum of the ratio parts, then multiply by 1.54.
  3. Convert to weight: multiply by the bulk density of cement, about 1,440 kg/m³.

Worked example for M20 (1 : 1.5 : 3), where the parts add up to 5.5:

  • Cement volume = 1.54 × 1 ÷ 5.5 = 0.28 m³
  • Cement weight = 0.28 × 1,440 ≈ 403 kg, or about 8 bags of 50 kg

Cement per cubic metre by ratio

Ratio (cement : sand : aggregate) Approx. cement per m³ Approx. 50 kg bags
1 : 3 : 6 (M10) about 220 kg about 4.4
1 : 2 : 4 (M15) about 315 kg about 6.3
1 : 1.5 : 3 (M20) about 400 kg about 8

A 1 : 5 cement-to-ballast mix works out at roughly 370 kg using the same method, and 1 : 6 at about 320 kg. These are estimates from the formula, not measured figures. Add around 5% for waste.

For M25 and above, the nominal 1 : 1 : 2 ratio would calculate to a very cement-rich result, but designed mixes normally use considerably less. See concrete grades M25, M30 and RC30.

Converting to bags

  • 50 kg bags (common in India and many other markets): divide kilograms by 50.
  • 25 kg bags (common in the UK): divide kilograms by 25.
  • 94 lb bags (US, about 42.6 kg): divide kilograms by 42.6.

For example, 320 kg of cement is about 13 bags of 25 kg, or about 7.5 bags of 42.6 kg.

Cubic yard version

One cubic yard is about 0.765 m³. Using the figures above, a typical mix needs roughly 230 to 300 kg per cubic yard, which is around 5 to 7 bags of 94 lb. Many ready-mix and bagged-concrete suppliers in the US describe mixes by the number of 94 lb sacks per cubic yard, and a mix of about 5 to 6 sacks is a common general-purpose choice. Check what your supplier uses.

Why real figures differ

  • Sand bulking: damp sand occupies more volume than dry sand, which changes batch proportions.
  • Aggregate shape and grading affect how tightly materials pack together.
  • Admixtures and supplementary materials, such as fly ash or slag, change the cement content.
  • Cement bags are not always filled to exactly their nominal weight, and cement density varies slightly.

For the volume side of the estimate, see how to calculate how much concrete you need. For the wider picture on ratios, see our guide to concrete mix ratios.

The complete guide to concrete mix ratios

Concrete Mix Ratios: Cement, Sand, Ballast and Water Explained
Read the guide

Keep exploring

Guides from other topics

All topics →