Concrete Mix Ratios

Concrete Mix Ratios for Roof Slabs, Columns, Lintels and Steps

Typical cement, sand and aggregate ratios for reinforced roof slabs, columns, lintels and concrete steps, with worked quantities and notes on when to get an engineer.

On this page
  1. Safety first: structural work needs a design
  2. Roof slab ratio and the 4-2-1 rule
  3. Worked example: cement for a 100 sq ft roof
  4. Columns and beams
  5. Lintels
  6. Steps and staircases
  7. Slabs: pouring over an existing slab, and bag coverage

Safety first: structural work needs a design

Roof slabs, columns, beams and lintels carry load. If one fails, people can be hurt. The ratios in this article are commonly quoted for ordinary residential work, but they are not a substitute for a structural design. The required grade, steel, cover, formwork and curing should come from drawings by a qualified engineer or from your local building rules. Where in doubt, ask.

For the general principles behind ratios, see our guide to concrete mix ratios.

Roof slab ratio and the 4-2-1 rule

For reinforced roof slabs in residential buildings, M20 (1 : 1.5 : 3) is commonly cited as a typical grade, and many local codes treat M20 as the minimum for reinforced concrete in mild conditions. Some builders use 1 : 2 : 4 for lighter work, but that is leaner and less suited to reinforced structural elements.

The 4-2-1 rule is a shorthand for the classic 1 : 2 : 4 mix: 4 parts aggregate, 2 parts sand, 1 part cement. It is easy to remember but gives a leaner mix than M20. For higher grades such as M25 and above, a mix design is expected; see concrete grades M25, M30 and RC30.

Worked example: cement for a 100 sq ft roof

Take a slab of 100 sq ft (about 9.3 m²) at 125 mm (5 in) thick, which is a common residential thickness (150 mm is also used):

  • Volume: 9.3 × 0.125 ≈ 1.16 m³ (about 1.5 cubic yards).
  • Cement for an M20 mix at roughly 400 kg per m³: about 465 kg, or around 9 to 10 bags of 50 kg.
  • Add about 5 to 10% for waste.

At 150 mm thickness, the volume rises to about 1.4 m³, needing around 11 bags. These figures are estimates; actual consumption depends on materials and the mix design. To see where per-cubic-metre numbers come from, read how much cement is needed for 1 cubic metre of concrete, and for the volume method, how to calculate how much concrete you need.

Columns and beams

M20 is again the typical grade quoted for columns and beams in small residential buildings, with higher grades such as M25 for taller or heavily loaded elements. Columns and beams usually have tightly spaced reinforcement, so aggregate size and workability matter: concrete must flow around the steel without leaving voids. Smaller aggregate (such as 10 mm or 20 mm) helps, as explained in 10 mm versus 20 mm aggregate.

Plinth beams are usually cast with the same grade as the other beams, commonly M20, but the exact specification comes from the design drawings. If you are asking about a house plan, check the structural notes.

Lintels

A lintel is a beam that spans an opening such as a door or window. In the UK, most builders buy precast lintels, which are manufactured under controlled conditions and have load tables. Casting your own on site is possible for some jobs, but it requires correct reinforcement and a suitable mix, typically a reinforced mix at least as rich as 1 : 1.5 : 3 or a specified strength such as RC25 or higher in UK terms.

Some points to know:

  • Bearing length: lintels normally need to rest on the masonry at each end for a minimum length (often at least 150 mm), but check the manufacturer’s data.
  • Size: the section depends on the span and load. A common pattern is a section 100 to 150 mm deep, with width matching the wall.
  • Weight: reinforced concrete weighs about 2,400 kg/m³. A 2.4 m lintel with a 100 × 150 mm section is 0.015 × 2.4 = 0.036 m³, or around 86 kg. Slimmer sections weigh less, and heavy lintels may need two people or lifting equipment.

Steps and staircases

Concrete steps are generally cast in reinforced concrete, and a mix around M20 (1 : 1.5 : 3) or a ready-mix designation specified for the job is typical. For exterior steps in frost-prone areas, an air-entrained mix is often advised. If you are fixing existing steps instead, see how to repair broken and crumbling concrete step edges.

To measure the quantity:

  1. For a simple set of solid steps, calculate each step as a block: width × tread depth × the height from the ground to that step’s top, then add them together.
  2. For a flight with a sloped slab underneath (waist slab), calculate the slab as a thin sloped rectangle, then add the triangular steps on top: half of riser × tread × width for each step.
  3. Add 5 to 10% for waste.

For example, ten steps with a 175 mm riser, 250 mm tread and 1 m width, on a 150 mm waist slab, require roughly 0.22 m³ for the triangular step wedges, plus the slab volume. Check with a supplier if you are unsure. The cost depends on local prices, and ready-mix suppliers may charge a premium or short-load fee for small quantities.

Slabs: pouring over an existing slab, and bag coverage

A new slab can generally be poured over an existing sound slab if it is clean, roughened and has a proper bonding or separation strategy. Whether it will be bonded or left unbonded depends on the project, and thin bonded toppings can crack or delaminate if the surface preparation is poor. Seek advice for anything beyond a simple overlay.

For bagged ready-mix, coverage depends on the thickness and the product’s stated yield. As a rough guide, a 20 kg bag of dry mix yields roughly 0.009 m³, which would cover about 0.09 m² at 100 mm thick, though bag yields vary. Always check the bag. For a larger pour such as a 24 × 24 ft slab, the calculation is length × width × thickness, then convert and add waste, as shown in our calculation guide.

The complete guide to concrete mix ratios

Concrete Mix Ratios: Cement, Sand, Ballast and Water Explained
Read the guide

Keep exploring

Guides from other topics

All topics →