Short answer
Most residential concrete slabs sit on about 100–150 mm (4–6 in) of compacted crushed stone. Four inches is the commonly cited minimum for patios, paths and shed bases, with around six inches for driveways, garage floors or soft ground. On clay or other poor soils, or where heavy loads are expected, some builders go deeper, laying the stone in thin compacted layers. Local building rules and the ground conditions take precedence over these general figures.
Depth by use
| Slab use | Typical compacted base depth |
|---|---|
| Footpath, light patio | about 75–100 mm (3–4 in) |
| Shed base | about 100 mm (4 in) |
| Driveway, garage floor | about 100–150 mm (4–6 in) |
| Poor, soft or clay soil, or heavy loads | more, often installed in several layers, with advice from an engineer for important structures |
For related thicknesses of the concrete itself, see whether 4 inches of concrete is enough for a shed base and how thick a concrete path needs to be. For a paved patio rather than a concrete slab, see how deep the sub-base should be for a patio.
Which material to use
Use angular crushed stone that locks together when compacted.
- UK: MOT Type 1 (a graded crushed stone sub-base) is the usual choice. Clean hardcore is sometimes used for deeper fills, topped with a finer layer.
- US: crusher run, road base or around 3/4-inch crushed stone such as #57 stone.
- Avoid smooth, rounded gravel, like pea gravel, for load-bearing bases. The round stones shift and don’t compact as well.
Free-draining stone helps with water and frost, but it must be on a properly shaped formation. A drainage fall away from buildings still matters.
Compaction
Spread the stone in layers and compact each one with a plate compactor, typically in layers of around 100 mm or less so the compaction reaches the full depth. A hand rammer will do on small areas, but it is hard work and less consistent. A well-compacted base shouldn’t move or leave footprints, and the surface should be level and at the correct height for the formwork.
Skipping compaction is one of the more common reasons slabs settle and crack. Before any of this, strip the topsoil and soft spots; see pouring concrete over dirt.
Calculating how much to order
Metric:
- Area (m²) × depth (m) = volume in m³. For example, 10 m² × 0.1 m = 1 m³.
- Add an allowance for compaction, since loose material shrinks when compacted. Around 20–30% extra is a typical rough allowance for crushed stone, but check with the supplier.
- Convert to tonnes. Crushed stone sub-base typically weighs a little over 2 tonnes per m³ when compacted, so ask your supplier for a conversion for the product you choose.
Imperial: at 4 inches deep, 100 square feet needs about 1.25 cubic yards of stone, before any compaction allowance. A cubic yard of crushed stone is commonly given as roughly 1.3–1.5 tons, depending on stone type and moisture.
Suppliers’ online calculators are helpful, and most will give the amount to order if you tell them the area, depth and use.
Sand blinding and membranes
A thin layer of sand (blinding), commonly around 25 mm, is sometimes spread over the stone to fill gaps and protect any membrane. Polythene sheeting is generally used under slabs for floors inside buildings, as a damp-proof membrane, and sometimes under external slabs to stop water draining out of the wet concrete. Whether you need either depends on the project.
Common mistakes
- Using too little stone, or only an inch or two.
- Using rounded gravel or soft fill.
- Compacting a thick layer in one pass.
- Forgetting the compaction allowance when ordering.
- Not allowing for the base depth when setting the finished slab level.
Once the base is ready, the process continues in how to lay a concrete slab.