A concrete slab is one of the most useful DIY projects: it can be a shed base, a patio, a garage floor or the starting point for a larger build. The job is mostly preparation. A good slab depends on a firm base, sensible formwork, a decent mix, and careful curing. This guide walks through the sequence and points to more detailed articles on each step.
Figures below are typical starting points. Always check what your own project needs, and if the slab will carry a building, a vehicle or a load-bearing wall, get advice from a structural engineer or your local building control.
Planning the slab
Before you dig, decide what the slab is for, because that sets its thickness, base and reinforcement.
- Footpaths and light patios: commonly around 75–100 mm (3–4 in) thick.
- Shed bases and garden buildings: commonly 100 mm (4 in) on a compacted base. See whether 4 inches of concrete is enough for a shed base.
- Driveways and garage floors: often 100–150 mm (4–6 in), sometimes more for heavy vehicles.
Mark out the area with string lines and pegs, and plan a slight fall (roughly 1:80, or about 12 mm per metre) so rainwater runs away from buildings. Where a slab meets a house, keep the finished surface comfortably below the damp-proof course. A gap of around 150 mm is the usual guidance, but check your own situation.
Preparing the base
Dig out enough depth for the concrete plus the sub-base, and remove topsoil, roots and any soft or organic material. The slab will only be as stable as the ground beneath it.
Lay a sub-base of crushed stone or hardcore, such as MOT Type 1 in the UK, and compact it in layers with a plate compactor (or a hand rammer on small jobs). A compacted layer of around 100 mm is a common minimum, with more for driveways or poor soil. Our guide on how much gravel you need under a concrete slab covers depths and quantities in more detail.
It is tempting to skip the base on firm ground. Read whether you can just pour concrete over dirt before deciding.
Setting up formwork and reinforcement
Formwork holds the wet concrete in shape. Use straight, sturdy boards (timber of 100 mm or 4 in depth suits a typical slab), pegged firmly on the outside and checked with a spirit level. Set the top edge at the finished level of the slab and build in the fall at this stage.
If you are reinforcing, support steel mesh or bar on spacers so it sits within the slab and not on the ground. Mesh dragged into position after the pour tends to end up at the bottom, where it does little. Whether you need it at all depends on the use; see rebar or wire mesh in a concrete slab and types of reinforced concrete slabs.
Choosing a concrete mix
Concrete is cement, sand (fine aggregate), coarse aggregate and water. The aggregate makes up most of the volume and acts as the bulk skeleton of the mix, while the cement paste binds it.
Common mixes, by volume:
| Use | Typical volume mix (cement : sand : coarse aggregate) | Or with all-in ballast |
|---|---|---|
| General purpose slabs, bases | 1 : 2 : 4 (sometimes quoted as 1 : 2 : 3) | about 1 : 5 |
| Driveways and heavy-duty slabs | 1 : 1.5 : 3 | about 1 : 3.5–4 |
You may see the “4 2 1 rule” mentioned, which is simply this 1 : 2 : 4 mix written the other way round: four parts aggregate, two parts sand, one part cement. These are rule-of-thumb mixes. Bagged mixes and ready-mix suppliers publish their own specifications, which are usually the safer choice if you are unsure.
Practical points:
- Water: use as little as you can while keeping the mix workable. Extra water makes concrete easier to place but weaker and more prone to cracking.
- Measure consistently: use the same bucket or shovel count for every batch.
- Washing-up liquid: bricklayers sometimes add it to mortar as a makeshift plasticiser. It is not a controlled admixture, and it is not recommended for structural concrete. If you want a plasticiser or air-entraining agent, use a product made for the purpose.
For driveway and path mixes, including permeable options, see concrete mixes for driveways, paths and pervious paving. If you are unsure whether to batch your own or buy bags, the article on whether it is cheaper to mix your own concrete looks at the cost side.
Working out how much concrete you need
Multiply length × width × thickness, all in metres, to get cubic metres. A 4 m × 3 m slab at 0.1 m thick needs 1.2 m³. Add a margin of roughly 5–10% for uneven ground and spillage.
For bagged concrete, a 20 kg bag makes roughly 0.009–0.01 m³ once mixed, so a cubic metre takes on the order of 100 bags. Check the yield printed on the bag you are buying. This is one reason ready-mix is usually sensible for anything larger than a small slab.
Pouring a slab in sections
Pouring in sections is common for DIYers who are mixing by hand or with a small mixer, because the concrete must be placed and finished before it starts to stiffen. A slab can be poured in sections, but each joint is a potential weak point, so plan them.
- Decide the joints in advance. Place sections so the joints fall where you would have put control joints anyway. See control joint spacing in concrete slabs.
- Use stop boards. A board across the formwork creates a clean edge. Some builders drill or notch it for reinforcement to pass through.
- Tie sections together. Dowels, reinforcement bars passing through the joint, or a keyway formed in the edge help limit one section moving up or down relative to its neighbour. The details depend on the slab’s load, so check them for heavily loaded slabs.
- Pour alternate bays, if you can, and let them stiffen before filling the gaps. This reduces the chance of damaging fresh edges.
- Protect finished edges. Avoid dragging screed boards or kneeling on partly set concrete.
Expect some downsides. Joints can show as visible lines, and surface finish can vary between pours. Cold joints, where fresh concrete meets concrete that has already set, can let water in. For a large garage floor or other structural slab, ordering ready-mix and pouring in one go is generally better than many small pours.
Finishing the surface
Strike off (screed) the concrete level with the forms using a straight edge in a sawing motion, then compact and level it. Wait for the surface water (bleed water) to disappear before floating. Finishing too early can trap water and weaken the surface. A wood float gives a slightly gritty finish, and a broom drawn across gives grip for paths and driveways. Edge the perimeter and cut any joints.
Curing
Concrete gains strength through a chemical reaction that needs moisture. Keep the slab covered or damp for several days after pouring. A common guideline is at least about seven days, with longer being better in dry or windy weather. Read more in curing concrete: methods, timing and why it matters.
Weather matters during the pour too. Rain on fresh concrete can damage the surface, and the guide to pouring concrete in the rain explains how to protect the slab.
Common mistakes
- Skipping or under-compacting the sub-base.
- Adding too much water to make the mix easier to work.
- Placing reinforcement on the ground instead of lifting it onto spacers.
- Overworking the surface while bleed water is still rising.
- Letting the slab dry out in sun or wind during the first week.
- Not planning joints, which can lead to random cracking.