A typical concrete garden path is 75-100 mm (3-4 in) thick over a compacted sub-base. See how thickness, base, joints and mix change with use.

On this page
  1. Short answer
  2. Thickness by use
  3. Sub-base
  4. Width, fall and edges
  5. Joints and reinforcement
  6. Mix and curing
  7. Quantity example

Short answer

A concrete path for foot traffic is commonly about 75–100 mm (3–4 in) thick, laid over a compacted sub-base. Many DIY guides settle on 100 mm as a sensible standard, since it gives a little margin for wheelbarrows and uneven ground. If vehicles will ever drive over it, treat it as a driveway and make it thicker; see below.

Thickness by use

Use Typical concrete thickness
Light garden path, foot traffic only about 75–100 mm (3–4 in)
Path used with wheelbarrows, bins, mobility scooters about 100 mm (4 in)
Occasional light vehicle crossing about 100–150 mm (4–6 in), often with mesh
Driveway commonly 100–150 mm (4–6 in), more for heavy vehicles

These are general figures. Soft ground, frost-prone areas and heavier loads all call for more thickness or a stronger base.

Sub-base

The concrete needs something solid under it. A layer of compacted crushed stone or hardcore (MOT Type 1 in the UK), commonly around 75–100 mm deep, is typical for paths. Strip topsoil first, and compact in layers. For details, see how much gravel you need under a concrete slab, and why you shouldn’t just pour over dirt.

Width, fall and edges

  • Width: about 900 mm (3 ft) is a comfortable minimum for a main path; secondary paths can be narrower. Allow more for wheelchair access.
  • Fall: build in a slight cross-fall, roughly 1:80 (about 12 mm per metre), so rainwater drains off the surface rather than ponding.
  • Edges: forms of 75–100 mm timber pegged firmly keep the edges straight and the depth consistent.
  • Next to buildings: keep the surface below the damp-proof course and slope it away from the wall.

Joints and reinforcement

Paths crack where the concrete shrinks, so joints give it somewhere to do so neatly. For a 100 mm path, a rule of thumb is joints at intervals of roughly 24–36 times the thickness, which means around 2.4–3.6 m; for narrow paths, joints about every 1.5–2 m are also common. Details are in control joint spacing in concrete slabs.

Many foot-traffic paths on firm ground are laid without steel, and some people add light mesh to hold cracks tight. See rebar or wire mesh in a concrete slab for a fuller discussion.

Mix and curing

A general-purpose mix, often around 1 : 2 : 4 (cement : sand : coarse aggregate) by volume or a bagged or ready-mix equivalent, is typical. More in concrete mixes for driveways, paths and pervious paving. Keep it damp or covered for several days afterwards, as described in curing concrete.

Quantity example

A path 10 m long, 1 m wide and 100 mm thick needs 10 × 1 × 0.1 = 1 m³ of concrete, plus a margin of roughly 5–10%. The sub-base at 100 mm deep needs a similar volume of stone before compaction allowance. Bagged concrete of this size means a lot of bags; compare with ordering ready-mix in is it cheaper to mix your own concrete.