Driveways and paths take a lot of weather and wear, so the mix matters more than it does for, say, a sheltered shed base. This article compares the common options: a DIY mix by volume, ready-mix delivered by truck, strength grades, and pervious (permeable) concrete, which is mixed on very different lines.
Quick answer
- Footpath: a general-purpose mix, commonly about 1 : 2 : 4 (cement : sand : coarse aggregate) by volume, or about 1 : 5 with all-in ballast.
- Driveway: a stronger, richer mix, commonly about 1 : 1.5 : 3, or a ready-mix designated for paving. Many suppliers recommend air-entrained concrete where there is frost or de-icing salt.
- Pervious paving: very little or no sand and a narrow range of coarse stone. It is not a general-purpose mix and generally needs specialist guidance.
Treat these as starting points. Suppliers and bag manufacturers publish tested mixes, which are a safer choice than a guess.
Driveway mixes
A driveway has to resist vehicle loads, frost, and sometimes salt. Typical DIY volume ratios for heavier-duty slabs are around 1 : 1.5 : 3 (cement : sand : coarse aggregate). For larger areas most people order ready-mix.
In the UK, ready-mix suppliers describe concrete by designated mixes under BS 8500, such as GEN, RC and PAV mixes. Paving mixes (PAV) are intended for external paved areas, and the right choice depends on how exposed the surface is, particularly to frost and de-icing salt. Tell the supplier what you are building, the thickness, and whether the surface will see frost, and ask which mix they recommend.
Thickness and base matter as much as strength. Domestic driveways are commonly 100–150 mm thick over a compacted sub-base, with reinforcement and joints. See how to lay a concrete slab, how much gravel you need under a concrete slab and control joint spacing.
Path mixes
Foot traffic is light, so a leaner general-purpose mix such as 1 : 2 : 4, or 1 : 5 ballast mix, is common. Thickness is usually around 75–100 mm; see how thick a concrete path needs to be. Use a stiff, workable mix with minimal water, since wetter concrete is weaker and more likely to crack.
Ready-mix for paths and driveways
Ready-mix is delivered wet, so it needs to be placed within a limited time. Before you order:
- Work out the volume in cubic metres and add a small margin.
- Ask whether the supplier charges a short-load fee for small volumes.
- Have the forms, base and any reinforcement finished before the truck arrives.
- Make sure there are enough people and tools (barrows, rakes, screed board) to place and level it promptly.
- Check access for the truck and whether the supplier can reach the pour area.
For a small path, you may prefer bagged mix. The cost comparison of mixing your own versus buying bags explains where each option makes sense. If you are using dry-bagged ready-to-mix, follow the water quantity printed on the bag, as adding more can weaken the result.
A mix made from only sand and cement is mortar, not concrete. Mortar lacks coarse aggregate and is not generally suited to slabs.
Understanding concrete grades
You will see strength grades like “M20” (common in India and elsewhere) or “C25/30” (European). The number is the target compressive strength in MPa (N/mm²) at 28 days. A higher number means stronger concrete, so 25 MPa is stronger than 20 MPa.
| Grade | Nominal mix (cement : sand : aggregate) | Typical use quoted |
|---|---|---|
| M5 | 1 : 5 : 10 | Bedding, levelling |
| M7.5 | 1 : 4 : 8 | Non-structural fill, bedding |
| M10 | 1 : 3 : 6 | Plain concrete under footings |
| M15 | 1 : 2 : 4 | Floors, light slabs, paths |
| M20 | 1 : 1.5 : 3 | Residential slabs and beams |
| M25 and above | Designed mix | Heavier loads, harsher exposure |
Grades above about M20 are normally designed from tested materials rather than a fixed ratio. As a rough guide, concrete reaches around 40% of its 28-day strength after about three days and around 65% after seven, so M20 might be near 8 MPa at three days. Real figures vary with cement type, temperature and curing, so don’t use these numbers for structural decisions. Strength gain depends heavily on good curing; see curing concrete.
Pervious concrete
Pervious (permeable) concrete is designed to let water drain through. To do that it leaves out most or all of the sand, so that connected voids remain between the stones. Published guidance gives figures along these lines:
- Coarse aggregate to cement of roughly 4 : 1 by weight, with small DIY batches sometimes quoted nearer 3 : 1.
- A low water-to-cement ratio of roughly 0.27–0.36 by weight.
- Voids of roughly 15–30%.
- Narrow-graded stone, commonly around 10–13 mm (3/8–1/2 in).
- Optionally, admixtures to help control set and workability.
It is sensitive to water. Too much and the paste runs off the stone and clogs the voids; too little and it doesn’t bind. Pervious concrete is also usually weaker than conventional concrete and needs a free-draining base to work. It is generally used for lighter-duty paving, and heavily loaded or hard-wheel-traffic areas need specialist design. It’s worth asking a specialist supplier for a proprietary mix and installation advice.
In England, rules on paving front gardens generally encourage permeable surfaces or drainage to a lawn or border for larger areas, so a permeable surface can help with planning. Check the current rules with your local authority before you start.
Common driveway problems
Cracking, scaling and settlement are frequent complaints. Common causes are:
- Too much water in the mix.
- A poorly compacted or too-thin base.
- Missing or poorly placed joints.
- Poor curing, especially in hot or windy weather.
- Frost damage to non-air-entrained concrete.
- De-icing salt on young concrete.
Most are avoidable with a good base, sensible mix, joints at suitable spacing and several days of curing. Pouring in wet conditions can also damage the surface; see pouring concrete in the rain.