The short answer

For a typical garden wall footing, bricklayers commonly wait about one to three days after the concrete is placed before starting the first course, and longer in cold or damp weather. The footing should be hard enough to walk on without leaving marks and to take the weight of the first courses.

There is no single fixed time. It depends on the concrete mix, the temperature, the size of the wall and the loads. Concrete keeps gaining strength for weeks (it is usually rated at 28 days), but it does not need to be at full strength to start laying low brickwork.

Footing versus slab

  • Strip footing for a garden wall: the wall load is modest and builds up gradually as you lay courses, so a short wait is often enough, provided the concrete has set firm.
  • Slab or raft under a larger structure: loads are heavier, so follow the engineer’s or concrete supplier’s guidance on when to start, often longer than for a small footing.
  • Foundations for a house or extension: follow the building control and engineer’s requirements, not general rules.

What affects the waiting time

  • Temperature: concrete gains strength more slowly in cold weather. In near-freezing conditions, new concrete needs protection and the wait is longer.
  • Mix: richer mixes and some additives gain strength faster than lean mixes.
  • Wetness: a footing that is very wet or has standing water on top needs to be properly set and dry enough for mortar to bond.
  • Load: a low wall is less demanding than one with piers or a heavy cap.
  • Curing: if the concrete dried out too fast, it may be weaker than expected. Keeping it damp and covered in the first days helps it gain strength; see curing brickwork for the same principles, and curing concrete for the slab itself.

How to check the base is ready

  • The surface is hard, not soft, crumbly or scuffing when you walk on it.
  • It is clean, free of loose material, laitance (a weak surface skin) and standing water.
  • It has reached the right level, since you will need a level base to start the first course; see how to lay the first course of bricks.

If in doubt, wait another day. An extra day costs little, and a footing that moves or cracks under a new wall is hard to fix.

Build in stages

Even once the footing is ready, you do not need to build the wall to full height at once. Laying a limited number of courses at a time lets the mortar and the concrete both gain strength. Bear in mind that how thick mortar joints should be matters when courses are built up, since heavy, wet mortar in tall lifts can squeeze out.

Footing basics

The depth and width of the footing matter as much as its age. See how deep a footing should be for a brick wall.