The short answer
It depends on how the screed is laid. Commonly quoted minimums for sand and cement screed are about 25 to 40 mm for a bonded screed, about 50 mm for an unbonded screed, and about 65 mm or more for a floating screed over insulation. These are typical guidance figures. Your design specification, the insulation or heating manufacturer’s instructions and the relevant standard for your country take priority.
Bonded, unbonded and floating
| Type | How it is laid | Commonly quoted thickness |
|---|---|---|
| Bonded | Stuck directly to a clean, prepared concrete base | around 25 to 40 mm |
| Unbonded | Laid on a membrane over the base | around 50 mm or more |
| Floating | Laid on insulation, usually with a membrane | around 65 mm or more |
- Bonded screeds rely on a good bond to the base. If the bond fails, the screed can sound hollow and crack or lift.
- Unbonded screeds are thicker because they have to hold together on their own.
- Floating screeds sit on insulation, so they need enough thickness and strength to carry loads without cracking.
Over underfloor heating
Underfloor heating pipes need to be covered by a minimum depth of screed, and the total thickness will depend on the pipe diameter and system. Figures in the range of 65 to 75 mm total are often quoted for sand and cement floating screeds, but the heating manufacturer’s instructions should always be followed. Thicker screeds take longer to heat and drying them takes longer; see how long sand and cement screed takes to dry. Liquid screeds are often laid thinner than sand and cement, but that is a different product.
Problems with too thin or too thick
- Too thin: the screed may crack, curl, dust or break up under load.
- Too thick: takes longer to dry, adds weight, and wastes material.
- Variable thickness: an uneven base can mean the screed is far thicker in places and may dry or crack unevenly. A levelling compound for small areas is sometimes the better option. See self-levelling compound vs sand and cement screed.
Checking levels
Use a laser level or a spirit level and screed battens set to the finished height. Mark the finished floor level on the walls before you start. Measure the slab so you know the depth at its high and low points.
For the mix and how much material you will need for a given thickness, see sand and cement floor screed mix ratios.